
Building converted into five homes
Work carried out: an entire building remodelled inside and out into five self-contained apartments.
View projectRotterdamse Bouwbedrijf handles complete remodelling and renovation projects in Vlaardingen. From a post-war family home in Westwijk or Holy to a building by the old harbour, with one dedicated team that knows the local stock: tight floor plans that call for a new layout, timber pile foundations in the older districts, and flats where the owners' association has a say.
Our own craftsmen run your project from start to finish. No rotating subcontractors.
From the post-war floor plans in Westwijk and Holy to the older buildings around the harbour and the centre.
A clear quote and a realistic schedule. Any additional work is always discussed first.
From a new layout and bathroom to a home tackled as a whole. In Vlaardingen it usually comes down to winning space within a tight floor plan. Click through to the service you are looking for.
From teardown to turnkey by one dedicated team.
View serviceMore living space, from foundation to finish.
View serviceA full extra floor.
View serviceComplete and fully watertight.
View serviceFrom design to installation.
View serviceMore space and light in your loft.
View serviceWalls and ceilings plastered smooth or ready to paint.
View serviceBetter comfort and a better energy label.
View serviceWe carried out these projects in Rotterdam, a quarter of an hour from Vlaardingen. They involve the same kind of housing as here: post-war and pre-war properties in which the layout was set out afresh and the services replaced in full, from structural shell to finish.

Work carried out: an entire building remodelled inside and out into five self-contained apartments.
View project
Work carried out: new layout, bathroom, kitchen, bedrooms and complete finishing.
View project
Work carried out: an entire block converted internally into apartments and studios, façade work included.
View projectWe visit, listen and think along with you about layout, materials and budget.
You receive a clear quote with a clear price and a realistic schedule.
Stripping out, structure and shell work. The foundation of your new home is in place.
Services, bathroom, kitchen, plastering, floors and painting.
We walk through everything together and hand over turn-key, with a guarantee.
Curious what's possible in your home?
Request your free renovation planArrange a free, no-obligation consultation. We come to you in Vlaardingen, look at what is possible in your home and draw up a plan with a clear price.
Vlaardingen was built in two waves: an old harbour and fishing town around the Grote Kerk, and around it the districts that were added at speed between 1950 and 1975. Which of the two your home stands in determines nearly everything: the floor plan, the foundation and the rules you will be dealing with.
The post-war homes were built efficiently and laid out small: a narrow kitchen separate from the living room, a bathroom of a few square metres, and three bedrooms of which the smallest barely takes a bed. The gain here is not in adding square metres but in rearranging: merging kitchen and living room, enlarging the bathroom at the expense of the smallest bedroom, and bringing the loft into use. That nearly always means work on a load-bearing wall, which we have calculated by a structural engineer first.
Holy holds family homes with a cavity, a shallow roof pitch and often a flat-roofed extension. Here the obvious combination is a dormer together with insulating the roof and the cavity: more usable space upstairs and a noticeably lower energy bill, in one project. At the rear a dormer is often permit-free; at the front the council assesses the design.
Around the Grote Kerk, the Westhavenplaats and the old harbours stand narrow, deep buildings, often split into a lower and an upper flat. Parts of this area are a protected townscape and there are listed buildings among them. Inside there is usually a great deal you can do; for the façade, the window frames and the roof the council assesses the plan. We agree that in advance and handle the planning permission.
Vlaardingen sits on peat and clay, and the pre-war buildings here stand on timber piles. Those only last as long as they stay under water; if the groundwater level drops, the pile head dries out and the timber rots. Tilting, jamming doors and cracks above window frames are the signals. Before a complete home renovation in such a building we have the foundation assessed first, because repair always comes before finishing.
Vlaardingen has a great deal of stacked housing from the 1950s to the 1970s. In those blocks material has to go up a narrow staircase or a small lift, there is no storage space on the landing, and sound towards the neighbours weighs heavily. We plan deliveries day by day, work with smaller batches at a time and take the deed of division into account when building up the floor.
In a post-war Vlaardingen home the biggest gains come from roof and floor insulation and better glazing. Only once the envelope is sorted does a heat pump make sense; the other way round it runs at high temperature and delivers little. Because the walls and ceilings are open during a renovation anyway, that is the cheapest moment to include insulation and ventilation. Grants are available for insulation work in the Netherlands; which ones apply at the time goes into your quote.
Considering a renovation in Vlaardingen? Take a look at our complete home renovation, bathroom renovation or window frames and insulation, browse our projects or arrange a no-obligation consultation. Besides Vlaardingen we also work in Rotterdam, Schiedam and the rest of the Randstad.